You don't have javascript enabled. Good luck with that.
Pencarian
Seluruh Rumah Pompa di Kebayoran Lama Berfungsi Optimal

All Pump Houses in Kebayoran Lama Ready to Anticipate Flooding

There are currently six pump houses with 16 pumps ready to minimize inundation

The Kebayoran Lama Sub-district Head Aroman says all pump houses in his region are in good condition and ready to face the rainy season.

"There are currently six pump houses with 16 pumps ready to minimize flooding. Each has a capacity of 60 liters per second, 100 liters per second, 250 liters per second up to 500 liters per second," he expressed, (11/19).

Bulak Cabe Pump House Construction Reaches 60 Percent

Those six pumps are in Kebayoran Lama Under pass (four pumps), Bungur Underpass (four pumps), Jalan Muhi 8 (three pumps), Jalan Muhi 2 (two pumps), Lemigas Housing Complex (one pump) and TVRI Complex area (two pumps).

"Another one type mobile pump is in front of Gandaria City belongs to the Water Resources Agency," he told.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye893 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye804 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye633 personAldi Geri Lumban Tobing
  4. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye470 personFolmer
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye460 personAldi Geri Lumban Tobing